A pair of H2 dash 9's hauls stacks east on the Chilli sub, while an SD40-2 is stopped at a redloard on the Ottumwa sub |
Date:
8/5/2006 |
Location:
Cameron, IL |
Views:
560 |
Collection Of:
Dustin Trejo |
Locomotives: |
Author: Dustin Trejo
|
|
Picture Categories: Bridge,Action |
This picture is part of album: around Galesburg Illinois 2006 |