In less than a year, you want be able to see this anymore. In June 2016 first the freight train uses the new basic Gotthard tunnel with a length of 57 km / 35 miles. Later the passenger trains are going to use it too. The two Crossrail are using the "wrong" track side (Switzerland uses the left side) as a stalled freight train blocks the left track due to a broken weel on one of the Re 4/4. |