Work in progress  Contributor's Pick!       
The east end of Great Neck station on the Port Washington Branch is seeing some changes. The steel work is up for a new signal bridge, which will control the interlocking just beyond the platforms. The configuration at the time of the photo is two tracks going to single, then a switch leading to a pocket track. The new set up will be track 2, the eastbound track, going straight into the pocket, and a set of crossovers to facilitate moves in and out, as well as for trains going from 2 to 1 to continue east, the arrangement that is currently in place.
Date: 9/23/1986 Location: Great Neck, NY Views: 242 Collection Of:   Tom Beckett
Author:  Tom Beckett
Work in progress
Picture Categories: Station,Passenger This picture is part of album:  Track and signals
Share
User Comments
Name Type Comments Date
Steve Coraggio General just a great shot!!!!!! 6/25/2016 9:34:44 AM

Add a Comment:  
Please Log in to leave a Comment.  
Link to this page: http://www.rrpicturearchives.net/showPicture.aspx?id=4058694