Switching Over
After getting clearance from the OT and UP dispatchers and throwing the manual switches the train begins to move. It had been waiting on the "wrong" main. Although double tracked each track is signaled in only one direction.
Date:
5/19/2006
Location:
Fallbridge, OR
Views:
74
Collection Of:
Keith Owen
Author:
Keith Owen
Picture Categories:
This picture is part of album:
GorgeRail 2006
Share
User Comments
No Comments on this picture
Add a Comment:
Please
Log in
to leave a Comment.
Link to this page:
http://www.rrpicturearchives.net/showPicture.aspx?id=388936