Were replacing Switch Timbers today. Heavier, longer, more difficult to get in place, but in the yard the backhoe can speed things up. 3 or 4 of us did 6 or 8 ties in 1 day with spiking later. /DL |
Date:
10/1/2011 |
Location:
Walkersville, MD Map ![Show Walkersville on a rail map](/images/map_us.gif) |
Views:
1900720 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
David Larrabee |
|
Author: David Larrabee
|
![New Switch Timbers](http://s3.amazonaws.com/rrpa_photos/73126/2011%2010%2001%20WS%20North%20Runaround%20Switch%20Timber%20Replacement%20032%20(2).JPG) |
Picture Categories: Yard,Track |
This picture is part of album: Walkersville Southern 2011 Notes |