Shoving 10 loads of frozen limestone towards the shaker at Shelly Materials. This was a slow process, as the frozen stone wound up in clumps the size of volkswagons and had to be heated before being unloaded. About two hours to each car. |
Date:
11/21/2008 |
Location:
Kent, OH Map ![Show Kent on a rail map](/images/map_us.gif) |
Views:
404 |
Collection Of:
![This is one of your favorite contributors](images/star_yellow_small.gif)
Richard Thompson |
Locomotives: |
Author: Richard Thompson
|
![SM 321](http://s3.amazonaws.com/rrpa_photos/6343/11-21-08%20photos%20014-1.jpg) |
Picture Categories: Winter |
This picture is part of album: CSX |